BEGIN:VCALENDAR
PRODID:-//Microsoft Corporation//OutlookMIMEDIR//EN
VERSION:2.0
CALSCALE:GREGORIAN
METHOD:PUBLISH
CLASS:PUBLIC
BEGIN:VEVENT
DTSTART:20250213T180000Z
DTEND:20250213T190000Z
DTSTAMP:20260613T005023Z
UID:{028BEF28-0507-4B16-8F1BAE10AC17B92F}
LOCATION:The Institution of Civil Engineers; 1 Great George Street; Westminster (London)
SUMMARY:The Woodsmith Project (2025 MinSouth - BTS Joint Lecture)
DESCRIPTION:The Woodsmith Project in North Yorkshire is a landmark Anglo American mining development  featuring a 37-kilometre tunnel to transport Polyhalite from Whitby to Teesside via conveyor.\n
 \n
 In 2023, the Tunnel Boring Machine (TBM) set a world record with a 25.8-kilometre single drive; now surpassing 29 kilometres.\n
 \n
 This presentation will provide an overview of the TBM cutterhead maintenance using timber heading techniques, showcasing STRABAG’s engineering innovations, ongoing progress on 1,600-metre shafts at the mine site and how challenges have been addressed since the 2021 BTS presentation.\n
 \n
 It  will also detail the innovative construction of two 380-metre shafts, through faulted geology and groundwater pressures,  using the UK’s first blind boring method at Lockwood Beck and Lady Cross.\n
 \n
 Note 1: This is an in-person lecture but will also be streamed live on Zoom.\n
 \n
 Note 2: Tea & coffee will be served from 17:30 hrs onwards\n
 \n
 Note 3: Post-lecture drinks and food will be served at the ICE bar.\n
 \n
  \n
 \n
 To register to attend inperson or virtually, go to this email address: https://www.eventbrite.com/e/1224758689209?aff=oddtdtcreator
PRIORITY:1
END:VEVENT
END:VCALENDAR
